2026
Solar & Renewable
80kva ups integrated with seperate charge controller and solar panels to power 2 elevators for 11 floor building

Load study
UPS installation
Distribution
Commissioning
80 kVA
UPS Capacity
City Campus
Campus
Protected
Critical Uptime
The facility suffered from frequent grid outages and high diesel generator operating costs, leading to high operational expenditure and unpredictable business downtime.
Conducted an extensive site energy audit and load study.
"The new hybrid solar infrastructure has cut our operational energy expenses by 65% while providing complete power reliability across our entire hub."
On site
Photography from the installation, commissioning and handover.
More work

2026

2026

2026
Share your project and our engineers will come back with sizing, scope and a clear quote, no obligation.